Snapshot of Lesson 6
Small Quantity Generators have a set number of regulatory requirements they must perform to maintain their exemption from full regulation. Here they are:
1. Generation Limit.
2. Accumulation Time Limit.
3. Accumulation Gross Weight Limit.
4. Accumulation of hazardous waste in containers
4a. Condition of containers.
4b. Compatibility of waste with container.
4c. Management of containers.
5. Inspections.
6. Special conditions for accumulation of incompatible wastes.
7. Labeling and marking of containers.
8. Land disposal restrictions.
9. Preparedness and prevention
9a. Maintenance and operation of facility.
9b. Required equipment.
9c. Testing and maintenance of equipment.
9d. Access to communications or alarm system.
9e. Required aisle space.
10. Arrangements with local authorities.
11. Emergency procedures.
11a. Emergency Coordinator.
11b. Emergency Info Postings.
11c. Employee Training.
11d. Response to Emergencies.
12. Transporting over 200 miles.
13. Accumulation time limit extension.
14. Rejected load.
15. Episodic Events.
0 comments